{"version":"1.0","provider_name":"Einstein Telescope","provider_url":"https:\/\/www.einsteintelescope-emr.eu\/en","author_name":"Nicole Vijgen","author_url":"https:\/\/www.einsteintelescope-emr.eu\/en\/author\/nvijgen\/","title":"New location for second drilling campaign - Einstein Telescope","type":"rich","width":600,"height":338,"html":"<blockquote class=\"wp-embedded-content\" data-secret=\"zZzmjGndlF\"><a href=\"https:\/\/www.einsteintelescope-emr.eu\/en\/2025\/06\/02\/new-location-for-second-drilling-campaign\/\">New location for second drilling campaign<\/a><\/blockquote><iframe sandbox=\"allow-scripts\" security=\"restricted\" src=\"https:\/\/www.einsteintelescope-emr.eu\/en\/2025\/06\/02\/new-location-for-second-drilling-campaign\/embed\/#?secret=zZzmjGndlF\" width=\"600\" height=\"338\" title=\"&#8220;New location for second drilling campaign&#8221; &#8212; Einstein Telescope\" data-secret=\"zZzmjGndlF\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\" class=\"wp-embedded-content\"><\/iframe><script type=\"text\/javascript\">\n\/* <![CDATA[ *\/\n\/*! This file is auto-generated *\/\n!function(d,l){\"use strict\";l.querySelector&&d.addEventListener&&\"undefined\"!=typeof URL&&(d.wp=d.wp||{},d.wp.receiveEmbedMessage||(d.wp.receiveEmbedMessage=function(e){var t=e.data;if((t||t.secret||t.message||t.value)&&!\/[^a-zA-Z0-9]\/.test(t.secret)){for(var s,r,n,a=l.querySelectorAll('iframe[data-secret=\"'+t.secret+'\"]'),o=l.querySelectorAll('blockquote[data-secret=\"'+t.secret+'\"]'),c=new RegExp(\"^https?:$\",\"i\"),i=0;i<o.length;i++)o[i].style.display=\"none\";for(i=0;i<a.length;i++)s=a[i],e.source===s.contentWindow&&(s.removeAttribute(\"style\"),\"height\"===t.message?(1e3<(r=parseInt(t.value,10))?r=1e3:~~r<200&&(r=200),s.height=r):\"link\"===t.message&&(r=new URL(s.getAttribute(\"src\")),n=new URL(t.value),c.test(n.protocol))&&n.host===r.host&&l.activeElement===s&&(d.top.location.href=t.value))}},d.addEventListener(\"message\",d.wp.receiveEmbedMessage,!1),l.addEventListener(\"DOMContentLoaded\",function(){for(var e,t,s=l.querySelectorAll(\"iframe.wp-embedded-content\"),r=0;r<s.length;r++)(t=(e=s[r]).getAttribute(\"data-secret\"))||(t=Math.random().toString(36).substring(2,12),e.src+=\"#?secret=\"+t,e.setAttribute(\"data-secret\",t)),e.contentWindow.postMessage({message:\"ready\",secret:t},\"*\")},!1)))}(window,document);\n\/* ]]> *\/\n<\/script>\n","thumbnail_url":"https:\/\/www.einsteintelescope-emr.eu\/en\/wp-content\/uploads\/sites\/4\/2025\/06\/kernen-GJVIS-scaled.jpg","thumbnail_width":1920,"thumbnail_height":2560,"description":"Within the second drilling campaign for the Einstein Telescope, a decision has been made to adjust the drilling schedule. Of the five planned drillings, two locations had already been designated. The remaining locations will be determined based on the results of the first two drillings and the previous drillings carried out last year. These drillings [&hellip;]"}